In which activity of the Fundamental Test Process is the test environment set up?
A. Test implementation and execution.
B. Test planning and control
C. Test analysis and design
D. Evaluating exit criteria and reporting
A system specification states that a particular field should accept alphabetical characters in either upper or lower case. Which of the following test cases is from an INVALID equivalence partition?
A. Feeds
B. F33ds
C. FEEDS
D. fEEDs
Given the following sample of pseudo code:
01 Input number of male rabbits 02 Input number of female rabbits 03 If male rabbits > 0 and female rabbits > 0 then 04 Input Do you want to breed (Yes / No) 05 If breed = o?05 If breed = ?o 06 Print deep male and female rabbits apart!?06
Print deep male and female rabbits apart! 07 End if 08 End If.
Which of the following test cases will ensure that statement ?6?is executed?
A. male rabbits = 1, female rabbits = 1, breed = Yes male rabbits = 1, female rabbits = 1, breed = Yes?
B. male rabbits = 1, female rabbits = 1, breed = No male rabbits = 1, female rabbits = 1, breed = No?
C. male rabbits = 1, female rabbits = 2, breed = Yes male rabbits = 1, female rabbits = 2, breed = Yes?
D. male rabbits = 1, female rabbits = 0, breed = No male rabbits = 1, female rabbits = 0, breed = No?
The above table shows 6 test procedures (P to U) that must now be entered into a test execution schedule. Business severity is regarded as the most important element in determining the sequence of the test procedures, but other dependencies must also be taken into consideration. Regression testing can only be run once all other tests have completed.
Which of the following represents the MOST effective sequence for the test execution schedule (where the first entry in the sequence is the first procedure to be run, the second entry is the second to be run and so on)?
A. R, Q, S, T, U, P
B. S, R, P, U, Q, T
C. Q, R, S, T, P, U
D. S, R, U, P, Q, T
Which two of the following are common attributes of maintenance testing?
a) It is carried out to ensure that the system will be reliable once in service.
b) It includes regression testing.
c) It requires the use of fully defined specifications.
d) It can include testing of a system after migration from one platform to another.
A. a and b
B. a and c
C. c and d
D. b and d
Which of the following is a project risk?
A. There are non-standard implementations of some features
B. We may not be able to get a contractor to join the test team as planned
C. The response times of the software may not be fast enough
D. The contract has a legal loophole which has affected the company profit The contract has a legal loophole which has affected the company? profit
Where may functional testing be performed?
A. At system and acceptance testing levels only
B. At all test levels
C. At all levels above integration testing
D. At the acceptance testing level only
Which of the following are white-box test design techniques?
a) Decision table testing. b) Decision coverage. c) Boundary value analysis. d) Error guessing. e) Statement testing.
A. a and e
B. b and d
C. b and e
D. e and d
Which of the following would NOT NORMALLY be considered for a testing role on a project?
A. System operator
B. Developer
C. Configuration manager
D. Performance specialist
Which of the following statements correctly describes the benefit of fault attacks?
A. They are more effective at finding faults than formal test design techniques
B. They are useful when there is limited experience in the test team
C. They can evaluate the reliability of a test object by attempting to force specific failures to occur
D. They are less structured than other experience-based techniques