A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?
A. Create a new technical object to represent the new measuring point.
B. Create a special measuring document and set the Counter Replacement indicator.
C. Dismantle the old measuring point and create a new measuring point.
D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.
In order costing configuration, for what is the allocation structure used? SAP C_TPLM30_65 Exam
A. To provide a method of consolidating costs in the Plant Maintenance Information System
B. To allocate costs to a hierarchy of maintenance technical objects
C. To determine the cost elements that are allowed in the plant maintenance order
D. To determine the settlement receiving elements for costs debited to the order
Where do you define initial and subsequent buffers for the maintenance plan strategy?
A. In the maintenance item
B. In the maintenance plan category settings
C. In the maintenance package for the maintenance strategy
D. In the maintenance plan scheduling parameters
What are consequences of activating alternative labeling for functional locations?
A. You can assign a serial number to a functional location.
B. You can change the primary functional location label and keep the old label as a historical SAP C_TPLM30_65 Exam functional location label.
C. The company code is automatically included in the functional location label.
D. You can change the primary functional location label and delete the old functional location label.
What does the maintenance plan category determine?
A. The type of maintenance call object the system generates for a due maintenance call
B. The type of technical object for the maintenance plan
C. How maintenance call objects are generated for a due maintenance call
D. The grouping of similar maintenance plans together for reporting
What happens when you set the system status in a maintenance order to technically completed (TECO)? (Choose two) SAP C_TPLM30_65 Exam
A. The system sets a deletion indicator for outstanding reservations.
B. The system sets a deletion indicator for outstanding purchase requisitions.
C. The system posts costs to the target account assignment.
D. The system sets a deletion indicator for purchase orders assigned to the maintenance order.
A customer wants to define an order type that includes a notification when the order is created.
SAP C_TPLM30_65 Exam
Which Customizing step(s) must you perform?
A. Assign the notification type to the order type according to plant assignment in Customizing.
B. Set the indicator for notification data or order header and assign the notification type to the order type in Customizing.
C. Set the Notification indicator for the order type according to plant assignment in Customizing.
D. Assign the notification type to the order type in Customizing.
What do you use to set up a refurbishment order for external refurbishment?
A. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.
B. An external operation that contains a control key for refurbishment.
C. An order type for external refurbishment and an assignment of a material with split valuation.
D. An order type for external refurbishment and a material item with item category External Refurbishment.
Your customer wants to assign maintenance orders to network activities automatically with the Maintenance Event Builder (MEB). Which of the following steps must you perform? (Choose two.)
A. Set the Define Transfer of Project or Invest Programindicator.
B. Assign maintenance orders manually to a revision withrevision type WPS-controlled.
C. Assign a network to a revision with revision type WPS-controlled.
D. Assign a hierarchical task list to a notification.
E. Assign the Reference PM/PS element to task list headers andnetwork activities.
How are the planned costs for a refurbished part or parts displayed in the planned/actual order report?
A. As revenue with a positive value
B. As costs with a negative value
C. As revenue with a negative value
D. As costs with a positive value