A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated?
A. REL (Released)
B. ATCO (All Tasks Completed)
C. TECO (Technically Completed)
D. NOCO (Notification Completed)
Which of the following control characters is available in the edit mask of the structure indicator?
A. D (numeric characters)
B. M (alphanumeric characters)
C. Y (special characters)
D. A (alpha characters)
How many time-based cycles can you use in a multiple-counter maintenance plan?
A. Three
B. Zero
C. Two
D. One
What are the prerequisites for creating a capacity requirement in a maintenance order operation? (Choose two)
A. The performing work center must have available capacity data.
B. The performing work center must have a control key with the Determine Capacity Requirements indicator set.
C. The numeric value for Work in the order operation must be greater than 0.
D. The operation must have a control key with the Determine Capacity Requirements indicator set.
Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?
A. The system restarts the maintenance plan.
B. The system retains the normal scheduled call dates.
C. The system fixes the next scheduled call date.
D. The system reschedules all previous scheduled call dates.
How can you maintain a distribution rule? (Choose two)
A. Manually, prior to the first settlement
B. Automatically, according to value categories in the order
C. Manually, after the business completion for the order
D. Automatically, based on a combination of Customizing and object master data
What happens when you set the system status in a maintenance order to technically completed (TECO)? (Choose two)
A. The system sets a deletion indicator for outstanding reservations.
B. The system sets a deletion indicator for outstanding purchase requisitions.
C. The system posts costs to the target account assignment.
D. The system sets a deletion indicator for purchase orders assigned to the maintenance order.
What does the structure indicator for a functional location determine? (Choose three)
A. The functional location type
B. The number of characters for each hierarchy level
C. The edit mask
D. The functional location category
E. The number of hierarchy levels for a particular structure
Your customer uses the dynamic availability check for stock material.
Where does the system check material availability for an operation?
A. In all plants where material inventory exists
B. Only in the plant where the material has been reserved
C. Only in the plant where the material is flagged with the special stock indicator for maintenance stock
D. In all plants where the material is managed with serial numbers
A maintenance work order has external processing. The planning plant and maintenance plant have different addresses. A purchase requisition is generated from a maintenance order.
With standard delivered SAP Customizing, which address is the default delivery address in the purchase requisition?
A. Work center
B. Storage location
C. Planning plant
D. Maintenance plant