Which item statuses can you select inside a material BOM? (Choose 2)
A. Service
B. Sales
C. Quality management
D. Engineering
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA? (Choose 2)
A. First in first out (FIFO)
B. 100% check
C. Simultaneous
D. By usage probability
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?
A. The planed order's component availability is checked.
B. The planed order is converted to production order.
C. The planned order's components are copied to the picking list.
D. The planed order generates capacity requirements
Why would you use phantom assemblies? (Choose 3)
A. To simplify the structure of bills of materials
B. To make the assignment of components easier
C. To reduce the number of changes required in bills of materials
D. To reduce the number of material masters
E. To increase the number of planning levels
What does forecasting in demand planning cycle include? (Choose 3)
A. Past quotation quantities
B. Past sales order quantites
C. Market intelligence
D. One-off events
E. Past procurment quantities
Which business processes are affected by setting in the order type-dependent parameters? (Choose 2)
A. Intiate quality inspections.
B. Select master data.
C. Define integration to cost accounting.
D. Implement engineering changes.
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag? (Choose 2)
A. Work center
B. Production version
C. Plant
D. Material
What are the possible results of a production planning run in Advanced Planning (PP/DS)? (Choose 3)
A. Planned order
B. Production order
C. Purchase requistion
D. Stock transport order
E. Scheduling agreement schedule line
Where do you maintain the work center that represents the production line for repetitive manufacturing? (Choose 2)
A. Production version
B. Routing
C. Repetitive manufacturing profile
D. Production cost collector
What are some uses for the low-level code assigned to each material? (Choose 2)
A. It is used in MRP to determine the sequence in which materials are planned.
B. It is used by product costing to determine how coast are rolled up.
C. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
D. it is used by ATP to determine the priority of alternative components.