You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?
A. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
B. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
C. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
D. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
A. Material Requirements Planning (MRP)
B. Capacity Requirements Planning (CRP)
C. Supply Network Planning (SNP)
D. Demand Planning (DP)
What does it mean for the production planner when MRP works with infinite capacities?
A. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
B. MRP creates capacity requirements without checking the capacity of a work center.
C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
D. MRP creates capacity requirements only if the work center has sufficient capacity.
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? (Choose 2)
A. Run MRP with quota arrangement.
B. Run MRP with automatic selection of production version.
C. Assign planned orders manual lying the planning table.
D. Run PP/DS heuristics for repetitive manufacturing.
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
A. Use heuristic.
B. Use a resource group.
C. Use a propagation range.
D. Use a planning group.
When can the automatic material availability check occur in a production order? (Choose 2)
A. At order release
B. At order confirmation
C. At order creation
D. At order settlement
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
A. Production order release
B. Material requirements planning
C. Backflushing
D. Kanban
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
A. Operation network
B. Work center hierarchy
C. Setup matrix
D. Resource network
For what production type are production orders used?
A. Process manufacturing processes
B. Replenishment controlled by control cycles
C. Discrete manufacturing processes
D. Period and quantity-oriented production
How can you achive a feasible production plan in case of capacity constraints? (Choose 3)
A. Select an alternative mode on a resource.
B. Adjust the available capacity.
C. Reduce the planning window
D. Form optimum sequence to reduce setup times
E. Execute an infinite production planning run