During the processing of production orders planned and actual costs are determined. On which of the following objects can you collect these costs? (Choose two)
A. Production order
B. Product cost collector
C. Work center
D. Planned order
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
A. The delta between the availability dates falls within the tolerance window defined in Customizing.
B. The fixed planned order is outside the rescheduling horizon.
C. Requirements planning has not been carried out.
D. The MRP elements are linked via fixed pegging.
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)
A. Production supply area
B. Repetitive manufacturing profile
C. Production version
D. Master record for serial numbers
E. Product cost collector