A pharmaceutical company is implementing Dynamics 365 Supply Chain Management.
The formulas for medication include a single active ingredient. The active ingredient will be defined with a target level and specified deviation ranges from the target.
You need to set up the active ingredient items.
Which two actions must you perform? Each answer presents a partial solution.
NOTE: Each correct selection is worth one point.
A. Configure inventory batch attributes.
B. Enable serial tracking.
C. Enable batch tracking.
D. Configure expiry dates for a batch.
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished. You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:
DRAG DROP
You need to meet the substitution requirements for User4 and User5.
What must you configure? To answer, drag the appropriate configurations to the correct substation requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place: